SMED
Single Minute Exchange of Die (SMED) is a systematic approach developed by Shigeo Shingo in the 1980s to drastically reduce the time required to changeover equipment from producing one product to another. The methodology, part of the Toyota Production System, aims to reduce setup time to a single-digit minute range (ideally under nine minutes), enabling smaller batch sizes, faster response to customer demand, and improved flexibility in manufacturing. SMED is a cornerstone of lean manufacturing and just-in-time production.
سوابق منبع
استنادات عیناً از سوابق منبع روش کپی شدهاند. هیچ تأیید در سطح ادعا از آنها استنباط نمیشود.
- Shingo, S. (1985). A revolution in manufacturing: The SMED system. Cambridge, MA: Productivity Press. · URL
- McIntosh, R. I., Culley, S. J., Mileham, A. T., & Owen, G. W. (2008). Changeover improvement: a structured methodology with supporting tools. International Journal of Production Research, 45(24), 5635-5656. · URL
ادعاهای گزینششده
ادعاها در دفتر ثبت شواهد ذخیره شدهاند، هر کدام با ارزیابی خاص خود.
این نما در صورت عدم وجود ارزیابی ادعا در دفتر ثبت، ادعایی ابداع نمیکند.
روشهای مرتبط
از گراف روش تولید شده و به عنوان روابط پیشنهادی ماشین نمایش داده میشود — هیچ ادعای مدرکی استنباط نمیشود.