ScholarGate
دستیار

مقایسهٔ روش‌ها

روش‌های انتخابی خود را کنار هم مرور کنید؛ ردیف‌های متفاوت برجسته شده‌اند.

نمودار کنترل مبتنی بر ریسک×کنترل فرایند آماری مبتنی بر ریسک×
حوزهطراحی آزمایشطراحی آزمایش
خانوادهProcess / pipelineProcess / pipeline
سال پیدایش1956 (economic design); refined through 1980s–2000s1920s (SPC foundations); risk-based integration formalized in 2000s–2010s
پدیدآورA. J. Duncan (economic design, 1956); T. J. Lorenzen & L. C. Vance (unified economic model, 1986)Integrated from SPC (Shewhart, 1920s; Deming, 1950s) and risk analysis frameworks (FDA ICH Q10, ISO 31000)
نوعQuantitative process monitoring methodHybrid quality-risk engineering method
منبع بنیادینLorenzen, T. J., & Vance, L. C. (1986). The economic design of control charts: A unified approach. Technometrics, 28(1), 3–10. DOI ↗Montgomery, D. C. (2020). Introduction to Statistical Quality Control (8th ed.). Wiley. ISBN: 978-1119399308
نام‌های دیگرeconomic control chart, risk-integrated SPC, cost-based control chart, economic design of control chartsRisk-based SPC, RBSPC, risk-prioritized SPC, risk-informed process monitoring
مرتبط66
خلاصهA risk-based control chart extends the classical Shewhart control chart by explicitly incorporating the costs and probabilities of two error types — false alarms (Type I) and missed shifts (Type II) — along with sampling costs, into the design of chart parameters. Rather than using arbitrary 3-sigma limits, the method selects sample size, sampling interval, and control limits to minimise the total expected cost or risk of operating the monitoring scheme.Risk-based statistical process control (Risk-based SPC) is an engineering quality method that integrates formal risk analysis — typically FMEA or a risk matrix — with statistical process monitoring to focus control chart resources on the process parameters that pose the greatest risk to product quality or system safety. Rather than applying control charts uniformly across all variables, risk-based SPC directs tighter monitoring toward high-risk, high-impact process characteristics identified through structured hazard prioritization.
ScholarGateمجموعه‌داده
  1. v1
  2. 2 منابع
  3. PUBLISHED
  1. v1
  2. 2 منابع
  3. PUBLISHED

رفتن به جست‌وجو دریافت اسلایدها

ScholarGateمقایسهٔ روش‌ها: Risk-based control chart · Risk-based statistical process control. بازیابی‌شده در 2026-06-15 از https://scholargate.app/fa/compare