ScholarGate
دستیار

مقایسهٔ روش‌ها

روش‌های انتخابی خود را کنار هم مرور کنید؛ ردیف‌های متفاوت برجسته شده‌اند.

برنامه‌ریزی عدد صحیح (IP) و برنامه‌ریزی عدد صحیح مختلط (MIP)×تحلیل مسیر کم‌هزینه / تحلیل هزینه-فاصله×برنامه‌ریزی خطی×
حوزهبهینه‌سازیتحلیل فضاییبهینه‌سازی
خانوادهProcess / pipelineProcess / pipelineProcess / pipeline
سال پیدایش195819941947
پدیدآورRalph Gomory (cutting planes, 1958); land-and-doig branch-and-bound (1960)Edsger Dijkstra (shortest path); GIS cost-surface adaptationGeorge B. Dantzig
نوعMathematical optimisation — exact combinatorial methodRaster cost-surface routingMathematical programming / continuous optimization
منبع بنیادینWolsey, L.A. (1998). Integer Programming. Wiley. ISBN: 9780471283669Dijkstra, E. W. (1959). A note on two problems in connexion with graphs. Numerische Mathematik, 1(1), 269–271. DOI ↗Dantzig, G.B. (1963). Linear Programming and Extensions. Princeton University Press. ISBN: 9780691059136
نام‌های دیگرIP, MIP, mixed-integer programming, mixed-integer linear programmingcost-distance analysis, accumulated cost surface, least-cost corridor, en düşük maliyetli yolLP, linear optimization, Doğrusal Programlama (LP)
مرتبط434
خلاصهInteger programming (IP), also called mixed-integer programming (MIP) when only some variables are restricted to whole numbers, is a branch of mathematical optimisation in which some or all decision variables must take integer or binary values. Building on linear programming, it was formalised through Ralph Gomory's cutting-plane method (1958) and the Land-and-Doig branch-and-bound algorithm (1960), and it has since become the standard exact framework for scheduling, assignment, routing, and resource-allocation problems.Least-cost path analysis finds the route between two locations that minimizes accumulated travel cost across a landscape, rather than minimizing straight-line distance. By encoding terrain, slope, land cover, and other frictions into a cost surface and accumulating cost outward from a source, it identifies optimal corridors for roads, pipelines, trails, power lines, and wildlife movement — a core raster-GIS technique built on Dijkstra's shortest-path logic.Linear programming (LP), pioneered by George B. Dantzig in 1947, is a mathematical method for finding the best value of a linear objective function — such as minimum cost or maximum profit — subject to a set of linear inequality and equality constraints. It is the foundational technique in operations research and underlies production planning, resource allocation, logistics, diet problems, and countless other decision-making scenarios across engineering, economics, and the natural sciences.
ScholarGateمجموعه‌داده
  1. v1
  2. 2 منابع
  3. PUBLISHED
  1. v1
  2. 2 منابع
  3. PUBLISHED
  1. v1
  2. 2 منابع
  3. PUBLISHED

رفتن به جست‌وجو دریافت اسلایدها

ScholarGateمقایسهٔ روش‌ها: Integer Programming · Least-Cost Path · Linear Programming. بازیابی‌شده در 2026-06-17 از https://scholargate.app/fa/compare