Material Requirements Planning
Material Requirements Planning (MRP) is a computerized system developed by Joseph Orlicky in the 1970s that calculates material requirements based on master production schedules and bill-of-materials data. MRP determines what materials to buy, how much to order, and when to order them to meet production demand while minimizing inventory carrying costs. It became a foundational technology for manufacturing planning and later evolved into manufacturing resource planning (MRP II) and enterprise resource planning (ERP) systems.
Allikakirje
Tsiteeringud kopeeritud meetodi allikakirjest sõna-sõnalt. Nendest ei saa järeldada väidete tasemel kinnitust.
- Orlicky, J. (1975). Material requirements planning: The new way of life in production and inventory management. New York: McGraw-Hill. · URL
- APICS (2020). APICS Dictionary (16th ed.). Chicago: APICS. · URL
Kureeritud väited
Väited on salvestatud tõendite registrisse, igal oma hinnanguga.
See vaade ei loo väite hinnangut, kui registris seda pole.
Seotud meetodid
Genereeritud meetodigraafist ja kuvatud masina soovitatud seostena – väiteid ei järeldata.