ScholarGate
Assistent

Võrdle meetodeid

Vaata valitud meetodeid kõrvuti; erinevad read on esile tõstetud.

Kanban×Materjalivajaduste planeerimine×SCOR-mudel×SMED×
ValdkondOperatsioonijuhtimineOperatsioonijuhtimineOperatsioonijuhtimineOperatsioonijuhtimine
PerekondMachine learningMachine learningMachine learningMachine learning
Tekkeaasta1950197519961985
LoojaTaiichi OhnoJoseph OrlickyPittiglio, Rabin, Todd & McGrathShigeo Shingo
TüüpProduction control systemMaterial planning algorithmSupply chain reference frameworkSetup time reduction technique
AlgallikasOhno, T. (1988). Toyota production system: Beyond large-scale production. Cambridge, MA: Productivity Press. link ↗Orlicky, J. (1975). Material requirements planning: The new way of life in production and inventory management. New York: McGraw-Hill. link ↗Stewart, G. (1997). Supply chain operations reference model: SCOR, logistics information management, Vol. 10 No. 5, pp. 62-74. link ↗Shingo, S. (1985). A revolution in manufacturing: The SMED system. Cambridge, MA: Productivity Press. link ↗
Rööpnimetusedvisual management, pull systemMRP, MRP Iquick changeover, rapid setup
Seotud5555
KokkuvõteKanban is a pull-based production control system developed by Taiichi Ohno at Toyota in the 1950s that uses visual signals (traditionally cards or bins) to trigger production and movement of materials based on actual demand rather than forecasts. The Japanese word 'kanban' means 'visual card' or 'sign,' and the system operates on the principle that work should flow in response to downstream requirements. Kanban is a foundational element of the Toyota Production System and lean manufacturing, enabling just-in-time production, reduced inventory, and improved flow efficiency.Material Requirements Planning (MRP) is a computerized system developed by Joseph Orlicky in the 1970s that calculates material requirements based on master production schedules and bill-of-materials data. MRP determines what materials to buy, how much to order, and when to order them to meet production demand while minimizing inventory carrying costs. It became a foundational technology for manufacturing planning and later evolved into manufacturing resource planning (MRP II) and enterprise resource planning (ERP) systems.The Supply Chain Operations Reference Model is a standardized framework for supply chain management developed by the Supply Chain Council (now APICS) in 1996. SCOR provides a structured approach to identify, evaluate, and improve supply chain processes across organizations, regardless of industry. It integrates planning, sourcing, manufacturing, delivery, and returns into a coherent operational model.Single Minute Exchange of Die (SMED) is a systematic approach developed by Shigeo Shingo in the 1980s to drastically reduce the time required to changeover equipment from producing one product to another. The methodology, part of the Toyota Production System, aims to reduce setup time to a single-digit minute range (ideally under nine minutes), enabling smaller batch sizes, faster response to customer demand, and improved flexibility in manufacturing. SMED is a cornerstone of lean manufacturing and just-in-time production.
ScholarGateAndmestik
  1. v1
  2. 2 Allikad
  3. PUBLISHED
  1. v1
  2. 2 Allikad
  3. PUBLISHED
  1. v1
  2. 2 Allikad
  3. PUBLISHED
  1. v1
  2. 2 Allikad
  3. PUBLISHED

Mine otsingusse Laadi slaidid alla

ScholarGateVõrdle meetodeid: Kanban · Material Requirements Planning · SCOR Model · SMED. Loetud 2026-06-19 aadressilt https://scholargate.app/et/compare