ScholarGate
Assistent

Võrdle meetodeid

Vaata valitud meetodeid kõrvuti; erinevad read on esile tõstetud.

Kinnise tsükliga tarneahel×Ruumilahendus (SLP)×
ValdkondOperatsioonijuhtimineOperatsioonijuhtimine
PerekondMachine learningMachine learning
Tekkeaasta20031973
LoojaGuide, V. D. R., & Van Wassenhove, L. N.Muther, R.
TüüpSupply chain strategyLayout design methodology
AlgallikasGuide, V. D. R., & Van Wassenhove, L. N. (2003). Business aspects of closed-loop supply chains. Pittsburgh: Carnegie Mellon University Press. link ↗Muther, R. (1973). Systematic layout planning (2nd ed.). Boston: Cahners Books. link ↗
Rööpnimetusedreverse logistics, circular economy logisticsSLP, plant layout
Seotud55
KokkuvõteA closed-loop supply chain (CLSC) integrates forward logistics (moving products to customers) with reverse logistics (recovering products, components, or materials from customers) to optimize resource recovery, reduce waste, and minimize environmental impact. Products flow forward for customer use, then flow backward for remanufacturing, refurbishment, recycling, or proper disposal. CLSC is driven by regulatory compliance (e.g., take-back laws), cost recovery, environmental responsibility, and increasingly, customer demand for sustainable business practices.Systematic Layout Planning (SLP) is a structured methodology developed by Richard Muther in the 1960s–1970s for designing optimal plant and facility layouts. The approach systematizes the consideration of material flow, personnel movement, equipment relationships, and space constraints to minimize material handling costs, improve safety, and enhance flexibility. SLP has become the foundational framework for facility design in manufacturing, warehousing, and service environments.
ScholarGateAndmestik
  1. v1
  2. 2 Allikad
  3. PUBLISHED
  1. v1
  2. 2 Allikad
  3. PUBLISHED

Mine otsingusse Laadi slaidid alla

ScholarGateVõrdle meetodeid: Closed-Loop Supply Chain · Facility Layout (SLP). Loetud 2026-06-17 aadressilt https://scholargate.app/et/compare