ScholarGate
Asistente

Comparar métodos

Revisa los métodos seleccionados uno junto a otro; las filas que difieren aparecen resaltadas.

Gráfico de Control Basado en Riesgos×Control Estadístico de Procesos Basado en Riesgos×
CampoDiseño experimentalDiseño experimental
FamiliaProcess / pipelineProcess / pipeline
Año de origen1956 (economic design); refined through 1980s–2000s1920s (SPC foundations); risk-based integration formalized in 2000s–2010s
Autor originalA. J. Duncan (economic design, 1956); T. J. Lorenzen & L. C. Vance (unified economic model, 1986)Integrated from SPC (Shewhart, 1920s; Deming, 1950s) and risk analysis frameworks (FDA ICH Q10, ISO 31000)
TipoQuantitative process monitoring methodHybrid quality-risk engineering method
Fuente seminalLorenzen, T. J., & Vance, L. C. (1986). The economic design of control charts: A unified approach. Technometrics, 28(1), 3–10. DOI ↗Montgomery, D. C. (2020). Introduction to Statistical Quality Control (8th ed.). Wiley. ISBN: 978-1119399308
Aliaseconomic control chart, risk-integrated SPC, cost-based control chart, economic design of control chartsRisk-based SPC, RBSPC, risk-prioritized SPC, risk-informed process monitoring
Relacionados66
ResumenA risk-based control chart extends the classical Shewhart control chart by explicitly incorporating the costs and probabilities of two error types — false alarms (Type I) and missed shifts (Type II) — along with sampling costs, into the design of chart parameters. Rather than using arbitrary 3-sigma limits, the method selects sample size, sampling interval, and control limits to minimise the total expected cost or risk of operating the monitoring scheme.Risk-based statistical process control (Risk-based SPC) is an engineering quality method that integrates formal risk analysis — typically FMEA or a risk matrix — with statistical process monitoring to focus control chart resources on the process parameters that pose the greatest risk to product quality or system safety. Rather than applying control charts uniformly across all variables, risk-based SPC directs tighter monitoring toward high-risk, high-impact process characteristics identified through structured hazard prioritization.
ScholarGateConjunto de datos
  1. v1
  2. 2 Fuentes
  3. PUBLISHED
  1. v1
  2. 2 Fuentes
  3. PUBLISHED

Ir a la búsqueda Descargar diapositivas

ScholarGateComparar métodos: Risk-based control chart · Risk-based statistical process control. Recuperado el 2026-06-15 de https://scholargate.app/es/compare