ScholarGate
Asistente

Comparar métodos

Revisa los métodos seleccionados uno junto a otro; las filas que difieren aparecen resaltadas.

Modelo de Ley de Corte de Lane×Algoritmo de Lerchs-Grossmann×Optimización de la disposición de tajos×
CampoIngeniería de minasIngeniería de minasIngeniería de minas
FamiliaProcess / pipelineProcess / pipelineProcess / pipeline
Año de origen198819651960
Autor originalK. F. LaneHelmut Lerchs and Israel GrossmannMining Engineering Practice
TipoEconomic optimization framework for ore classificationGraph-theoretic algorithm for pit limit optimizationOptimization framework for underground mine excavation design
Fuente seminalLane, K. F. (1988). The economic definition of ore: cutoff grades in theory and practice. Mining Journal Books, London. link ↗Lerchs, H., & Grossmann, I. F. (1965). Optimum design of open-pit mines. Canadian Mining and Metallurgical Bulletin, 58(633), 47-54. link ↗Brady, B. H. G., & Brown, E. T. (2004). Rock mechanics for underground mining. Springer Science+Business Media. link ↗
AliasLane Model, Cut-off Grade Optimization, Lane's Optimization ModelLerchs-Grossmann Method, LG AlgorithmStope Design, Underground Mine Layout, Panel Design
Relacionados343
ResumenLane's Cut-off Grade Model, developed by Kenneth F. Lane and formalized in his 1988 book, provides a rigorous economic framework for determining the minimum grade at which ore should be mined and processed. It accounts for variable mining costs, metallurgical recovery, and commodity prices to optimize profit per unit processed. The model is foundational in mining economics and underpins daily operational decisions at thousands of mines worldwide.The Lerchs-Grossmann Algorithm is a graph-theoretic method for determining the ultimate pit limit in open-pit mining operations. Introduced by Helmut Lerchs and Israel Grossmann in 1965, it maximizes the net present value of extracted ore while respecting slope stability constraints. This algorithm forms the theoretical foundation for most modern pit optimization software.Stope layout optimization is the process of designing the size, shape, and spatial arrangement of underground mine excavations (stopes) to maximize ore recovery while maintaining safety and economic viability. It balances the desire for large extraction volumes against rock mechanics constraints and support costs. The layout determines mining productivity, capital investment in support systems, and long-term mine life.
ScholarGateConjunto de datos
  1. v1
  2. 2 Fuentes
  3. PUBLISHED
  1. v1
  2. 2 Fuentes
  3. PUBLISHED
  1. v1
  2. 2 Fuentes
  3. PUBLISHED

Ir a la búsqueda Descargar diapositivas

ScholarGateComparar métodos: Cut-off Grade (Lane) · Lerchs-Grossmann Algorithm · Stope Layout. Recuperado el 2026-06-18 de https://scholargate.app/es/compare