ScholarGate
Asistente

Comparar métodos

Revisa los métodos seleccionados uno junto a otro; las filas que difieren aparecen resaltadas.

Evaluación Proporcional Compleja×Sistema de Medición del Impacto de Criterios×
CampoToma de decisionesToma de decisiones
FamiliaMCDMMCDM
Año de origen19962025
Autor originalZavadskas, E. K., Kaklauskas, A.Bošković, S., Jovčić, S., Simić, V., Švadlenka, L., Dobrodolac, M., Bacanin, N.
TipoProportional assessment (benefit/cost split)Impact-based weighted scoring (criterion-level deviation analysis)
Fuente seminalZavadskas, E. K., Kaklauskas, A. (1996). Determination of an Efficient Contractor by Using the New Method of Multicriteria Assessment. International Symposium for The Organization and Management of Construction. Shaping Theory and Practice. Vol. 2: Managing the Construction Project and Managing Risk. CIB W 65 link ↗Bošković, S., Jovčić, S., Simić, V., Švadlenka, L., Dobrodolac, M., Bacanin, N. (2025). A New Criteria Importance Assessment (CIMAS) Method in Multi-Criteria Group Decision-Making: Criteria Evaluation for Supplier Selection. FACTA UNIVERSITATIS — Series: Mechanical Engineering DOI ↗
Alias
Relacionados88
ResumenCOPRAS (Complex Proportional Assessment) is a ranking multi-criteria decision-making (MCDM) method introduced by Zavadskas, E. K., Kaklauskas, A. in 1996. It turns a decision matrix of alternatives scored on multiple criteria into a structured, reproducible result.CIMAS (Criterion Impact MeAsurement System) is a weight subjective multi-criteria decision-making (MCDM) method introduced by Bošković, S., Jovčić, S., Simić, V., Švadlenka, L., Dobrodolac, M., Bacanin, N. in 2025. It turns a decision matrix of alternatives scored on multiple criteria into a structured, reproducible result.
ScholarGateConjunto de datos
  1. v1
  2. 1 Fuentes
  3. PUBLISHED
  1. v1
  2. 1 Fuentes
  3. PUBLISHED

Ir a la búsqueda Descargar diapositivas

ScholarGateComparar métodos: COPRAS · CIMAS. Recuperado el 2026-06-17 de https://scholargate.app/es/compare