Risk-based control chart
A risk-based control chart extends the classical Shewhart control chart by explicitly incorporating the costs and probabilities of two error types — false alarms (Type I) and missed shifts (Type II) — along with sampling costs, into the design of chart parameters. Rather than using arbitrary 3-sigma limits, the method selects sample size, sampling interval, and control limits to minimise the total expected cost or risk of operating the monitoring scheme.
Εγγραφή πηγής
Οι παραπομπές αντιγράφονται αυτούσιες από την εγγραφή πηγής της μεθόδου. Δεν υπονοείται επαλήθευση σε επίπεδο ισχυρισμού από αυτές.
- Lorenzen, T. J., & Vance, L. C. (1986). The economic design of control charts: A unified approach. Technometrics, 28(1), 3–10. · DOI 10.1080/00401706.1986.10488092
- Duncan, A. J. (1956). The economic design of X̄ charts used to maintain current control of a process. Journal of the American Statistical Association, 51(274), 228–242. · DOI 10.1080/01621459.1956.10501322
Επιμελημένοι ισχυρισμοί
Οι ισχυρισμοί έχουν αποθηκευτεί στο καθολικό τεκμηρίων, καθένας με τη δική του αξιολόγηση.
Αυτή η προβολή δεν επινοεί αξιολόγηση ισχυρισμού όταν το καθολικό δεν έχει κανέναν.
Σχετικές μέθοδοι
Δημιουργούνται από τον γράφο μεθόδων και εμφανίζονται ως προτεινόμενες από μηχανή σχέσεις — δεν υπονοείται ισχυρισμός τεκμηρίου.