ScholarGate
Assistent

Sammenlign metoder

Gennemgå dine valgte metoder side om side; rækker, der afviger, er fremhævet.

Kompleks Proportional Vurdering×Criterion Impact MeAsurement System×
FagområdeBeslutningstagningBeslutningstagning
FamilieMCDMMCDM
Oprindelsesår19962025
OphavspersonZavadskas, E. K., Kaklauskas, A.Bošković, S., Jovčić, S., Simić, V., Švadlenka, L., Dobrodolac, M., Bacanin, N.
TypeProportional assessment (benefit/cost split)Impact-based weighted scoring (criterion-level deviation analysis)
Oprindelig kildeZavadskas, E. K., Kaklauskas, A. (1996). Determination of an Efficient Contractor by Using the New Method of Multicriteria Assessment. International Symposium for The Organization and Management of Construction. Shaping Theory and Practice. Vol. 2: Managing the Construction Project and Managing Risk. CIB W 65 link ↗Bošković, S., Jovčić, S., Simić, V., Švadlenka, L., Dobrodolac, M., Bacanin, N. (2025). A New Criteria Importance Assessment (CIMAS) Method in Multi-Criteria Group Decision-Making: Criteria Evaluation for Supplier Selection. FACTA UNIVERSITATIS — Series: Mechanical Engineering DOI ↗
Aliasser
Relaterede88
ResuméCOPRAS (Complex Proportional Assessment) is a ranking multi-criteria decision-making (MCDM) method introduced by Zavadskas, E. K., Kaklauskas, A. in 1996. It turns a decision matrix of alternatives scored on multiple criteria into a structured, reproducible result.CIMAS (Criterion Impact MeAsurement System) is a weight subjective multi-criteria decision-making (MCDM) method introduced by Bošković, S., Jovčić, S., Simić, V., Švadlenka, L., Dobrodolac, M., Bacanin, N. in 2025. It turns a decision matrix of alternatives scored on multiple criteria into a structured, reproducible result.
ScholarGateDatasæt
  1. v1
  2. 1 Kilder
  3. PUBLISHED
  1. v1
  2. 1 Kilder
  3. PUBLISHED

Gå til søgning Hent slides

ScholarGateSammenlign metoder: COPRAS · CIMAS. Hentet 2026-06-17 fra https://scholargate.app/da/compare