ScholarGate
Asistent

Porovnat metody

Prohlédněte si vybrané metody vedle sebe; řádky, které se liší, jsou zvýrazněny.

Hospodaření se srážkovými vodami×Posouzení vlivů na životní prostředí×
OborEnvironmentální inženýrstvíEnvironmentální inženýrství
RodinaProcess / pipelineProcess / pipeline
Rok vzniku19801970
TvůrceUrban hydrologists and engineersU.S. National Environmental Policy Act (NEPA)
Typdesign and simulation pipelinesystematic assessment and decision-support pipeline
Původní zdrojUrbonas, B., & Stahre, P. (1993). Stormwater Best Management Practices and Detention. Prentice Hall. ISBN: 978-0134445915Glasson, J., Therivel, R., & Chadwick, A. (2005). Introduction to Environmental Impact Assessment (3rd ed.). Routledge. ISBN: 978-0415303910
Další názvyurban stormwater, runoff management, wet weather control, low-impact developmentEIA, impact assessment, environmental screening, cumulative effects assessment
Příbuzné34
ShrnutíStormwater management is the planning and engineering of urban water systems to control, treat, and utilize rainwater runoff from developed areas. Traditional approaches (pipes, detention basins) conveyed runoff rapidly to streams or treatment plants; modern green infrastructure approaches (permeable pavements, bioswales, retention ponds) reduce runoff volume through infiltration and reuse while improving water quality. Stormwater management integrates hydrologic modeling, water quality assessment, and infrastructure design to meet regulatory requirements and climate resilience goals.Environmental Impact Assessment (EIA) is a systematic, structured process to identify, predict, and evaluate the environmental and social consequences of proposed development projects (infrastructure, extraction, manufacturing) before implementation. Mandated by law in most jurisdictions since the 1970s (NEPA in USA, EU Directive 2011/92/EU), EIA integrates scientific analysis of air quality, water resources, biodiversity, noise, and socioeconomic effects with stakeholder consultation and decision-making frameworks to inform project approval, design modification, or rejection.
ScholarGateDatová sada
  1. v1
  2. 3 Zdroje
  3. PUBLISHED
  1. v1
  2. 3 Zdroje
  3. PUBLISHED

Přejít na hledání Stáhnout prezentaci

ScholarGatePorovnat metody: Stormwater Management · Environmental Impact Assessment. Získáno 2026-06-19 z https://scholargate.app/cs/compare