ScholarGate
Asistent

Porovnat metody

Prohlédněte si vybrané metody vedle sebe; řádky, které se liší, jsou zvýrazněny.

Regulační diagram založený na riziku×Analýza způsobilosti procesu (Cp, Cpk)×
OborPlánování experimentůStatistika
RodinaProcess / pipelineProcess / pipeline
Rok vzniku1956 (economic design); refined through 1980s–2000s1986
TvůrceA. J. Duncan (economic design, 1956); T. J. Lorenzen & L. C. Vance (unified economic model, 1986)Victor Kane
TypQuantitative process monitoring methodQuantitative process evaluation index
Původní zdrojLorenzen, T. J., & Vance, L. C. (1986). The economic design of control charts: A unified approach. Technometrics, 28(1), 3–10. DOI ↗Kane, V. E. (1986). Process capability indices. Journal of Quality Technology, 18(1), 41–52. DOI ↗
Další názvyeconomic control chart, risk-integrated SPC, cost-based control chart, economic design of control chartsProcess Capability Indices, Capability Study, Süreç Yeterlilik Analizi, Process Performance Analysis
Příbuzné62
ShrnutíA risk-based control chart extends the classical Shewhart control chart by explicitly incorporating the costs and probabilities of two error types — false alarms (Type I) and missed shifts (Type II) — along with sampling costs, into the design of chart parameters. Rather than using arbitrary 3-sigma limits, the method selects sample size, sampling interval, and control limits to minimise the total expected cost or risk of operating the monitoring scheme.Process Capability Analysis quantifies how well a manufacturing or business process produces output within specified tolerance limits. Introduced formally by Victor Kane in 1986, it summarises process spread and centering into dimensionless indices — most notably Cp and Cpk — allowing engineers and quality managers to judge whether a stable process is inherently capable of meeting customer or design specifications consistently.
ScholarGateDatová sada
  1. v1
  2. 2 Zdroje
  3. PUBLISHED
  1. v1
  2. 1 Zdroje
  3. PUBLISHED

Přejít na hledání Stáhnout prezentaci

ScholarGatePorovnat metody: Risk-based control chart · Process Capability Analysis. Získáno 2026-06-15 z https://scholargate.app/cs/compare