Porovnat metody
Prohlédněte si vybrané metody vedle sebe; řádky, které se liší, jsou zvýrazněny.
| Algoritmus Lerchse a Grossmanna× | Model mezní těžební jakosti (Lane's Cut-off Grade Model)× | Optimalizace rozvržení dobývacích prostorů× | |
|---|---|---|---|
| Obor | Hornictví | Hornictví | Hornictví |
| Rodina | Process / pipeline | Process / pipeline | Process / pipeline |
| Rok vzniku≠ | 1965 | 1988 | 1960 |
| Tvůrce≠ | Helmut Lerchs and Israel Grossmann | K. F. Lane | Mining Engineering Practice |
| Typ≠ | Graph-theoretic algorithm for pit limit optimization | Economic optimization framework for ore classification | Optimization framework for underground mine excavation design |
| Původní zdroj≠ | Lerchs, H., & Grossmann, I. F. (1965). Optimum design of open-pit mines. Canadian Mining and Metallurgical Bulletin, 58(633), 47-54. link ↗ | Lane, K. F. (1988). The economic definition of ore: cutoff grades in theory and practice. Mining Journal Books, London. link ↗ | Brady, B. H. G., & Brown, E. T. (2004). Rock mechanics for underground mining. Springer Science+Business Media. link ↗ |
| Další názvy≠ | Lerchs-Grossmann Method, LG Algorithm | Lane Model, Cut-off Grade Optimization, Lane's Optimization Model | Stope Design, Underground Mine Layout, Panel Design |
| Příbuzné≠ | 4 | 3 | 3 |
| Shrnutí≠ | The Lerchs-Grossmann Algorithm is a graph-theoretic method for determining the ultimate pit limit in open-pit mining operations. Introduced by Helmut Lerchs and Israel Grossmann in 1965, it maximizes the net present value of extracted ore while respecting slope stability constraints. This algorithm forms the theoretical foundation for most modern pit optimization software. | Lane's Cut-off Grade Model, developed by Kenneth F. Lane and formalized in his 1988 book, provides a rigorous economic framework for determining the minimum grade at which ore should be mined and processed. It accounts for variable mining costs, metallurgical recovery, and commodity prices to optimize profit per unit processed. The model is foundational in mining economics and underpins daily operational decisions at thousands of mines worldwide. | Stope layout optimization is the process of designing the size, shape, and spatial arrangement of underground mine excavations (stopes) to maximize ore recovery while maintaining safety and economic viability. It balances the desire for large extraction volumes against rock mechanics constraints and support costs. The layout determines mining productivity, capital investment in support systems, and long-term mine life. |
| ScholarGateDatová sada ↗ |
|
|
|