SMED
Single Minute Exchange of Die (SMED) is a systematic approach developed by Shigeo Shingo in the 1980s to drastically reduce the time required to changeover equipment from producing one product to another. The methodology, part of the Toyota Production System, aims to reduce setup time to a single-digit minute range (ideally under nine minutes), enabling smaller batch sizes, faster response to customer demand, and improved flexibility in manufacturing. SMED is a cornerstone of lean manufacturing and just-in-time production.
Изходен запис
Цитиранията са копирани дословно от изходния запис на метода. Те не предполагат проверка на ниво твърдение.
- Shingo, S. (1985). A revolution in manufacturing: The SMED system. Cambridge, MA: Productivity Press. · URL
- McIntosh, R. I., Culley, S. J., Mileham, A. T., & Owen, G. W. (2008). Changeover improvement: a structured methodology with supporting tools. International Journal of Production Research, 45(24), 5635-5656. · URL
Подбрани твърдения
Твърденията са запазени в регистъра на доказателствата, всяко със собствена оценка.
Този изглед не измисля оценка на твърдение, когато регистърът няма такава.
Свързани методи
Генерирани от графа на методите и показани като предложени от машината връзки — не се предполага твърдение за доказателство.