Сравнение на методи

Прегледайте избраните методи един до друг; редовете с разлики са откроени.

SCOR модел×Планиране на производствени поръчки×
ОбластОперативен мениджмънтОперативен мениджмънт
СемействоMachine learningMachine learning
Година на възникване19962016
СъздателPittiglio, Rabin, Todd & McGrathPinedo, M. L.
ТипSupply chain reference frameworkCombinatorial scheduling problem
Основополагащ източникStewart, G. (1997). Supply chain operations reference model: SCOR, logistics information management, Vol. 10 No. 5, pp. 62-74. link ↗Pinedo, M. L. (2016). Scheduling: Theory, algorithms, and systems (5th ed.). Cham: Springer. DOI ↗
Други названияjob scheduling, machine scheduling
Свързани55
РезюмеThe Supply Chain Operations Reference Model is a standardized framework for supply chain management developed by the Supply Chain Council (now APICS) in 1996. SCOR provides a structured approach to identify, evaluate, and improve supply chain processes across organizations, regardless of industry. It integrates planning, sourcing, manufacturing, delivery, and returns into a coherent operational model.Job shop scheduling is the problem of assigning a set of jobs (tasks) to a set of machines (resources) over time, subject to precedence and capacity constraints, with the goal of optimizing performance metrics such as makespan (total completion time), lateness, or cost. The job shop problem is a classic combinatorial optimization problem in operations research, addressed through heuristics (greedy dispatching rules, simulated annealing, genetic algorithms) and exact algorithms (branch-and-bound, constraint programming). It is fundamental to manufacturing, project management, and computational scheduling.
ScholarGateНабор от данни
  1. v1
  2. 2 Източници
  3. PUBLISHED
  1. v1
  2. 2 Източници
  3. PUBLISHED

Към търсенето Изтегляне на слайдове

ScholarGateСравнение на методи: SCOR Model · Job Shop Scheduling. Извлечено на 2026-06-19 от https://scholargate.app/bg/compare