SMED
Single Minute Exchange of Die (SMED) is a systematic approach developed by Shigeo Shingo in the 1980s to drastically reduce the time required to changeover equipment from producing one product to another. The methodology, part of the Toyota Production System, aims to reduce setup time to a single-digit minute range (ideally under nine minutes), enabling smaller batch sizes, faster response to customer demand, and improved flexibility in manufacturing. SMED is a cornerstone of lean manufacturing and just-in-time production.
سجل المصدر
تم نسخ الاستشهادات حرفيًا من سجل مصدر المنهج. لا يُستدل على أي تحقق على مستوى الادعاء منها.
- Shingo, S. (1985). A revolution in manufacturing: The SMED system. Cambridge, MA: Productivity Press. · URL
- McIntosh, R. I., Culley, S. J., Mileham, A. T., & Owen, G. W. (2008). Changeover improvement: a structured methodology with supporting tools. International Journal of Production Research, 45(24), 5635-5656. · URL
الادعاءات المنسقة
تم حفظ الادعاءات في دفتر الأستاذ الخاص بالأدلة، ولكل منها تقييمها الخاص.
هذه الواجهة لا تخترع تقييمًا للادعاء عندما لا يكون دفتر الأستاذ يحتوي على واحد.
المنهجيات ذات الصلة
تم إنشاؤها من الرسم البياني للمنهج وتظهر كعلاقات مقترحة آليًا - لا يُستدل على أي ادعاء دليل.