ScholarGate
المساعد

قارن الطرق

راجع الطرق التي اخترتها جنبًا إلى جنب؛ الصفوف المختلفة مميَّزة.

Valuation Studies Method×Infrastructure Studies×
المجالScience Technology StudiesScience Technology Studies
العائلةProcess / pipelineProcess / pipeline
سنة النشأة20131996
صاحب الطريقةClaes-Fredrik Helgesson, Fabian Muniesa, Michèle LamontSusan Leigh Star, Geoffrey Bowker, Karen Ruhleder
النوعPractice-oriented method for studying valuationQualitative method for studying relational infrastructure
المصدر التأسيسيHelgesson, C.-F., & Muniesa, F. (2013). For what it's worth: an introduction to valuation studies. Valuation Studies, 1(1), 1-10. DOI ↗Star, S. L., & Ruhleder, K. (1996). Steps toward an ecology of infrastructure: design and access for large information spaces. Information Systems Research, 7(1), 111-134. DOI ↗
الأسماء البديلةSociology of valuation, Valography, Study of evaluation practicesInfrastructural inversion, Ecology of infrastructure, Study of boundary objects
ذات صلة44
الملخصThe valuation studies method treats valuation—the production, measurement, ordering, and contestation of worth—as a social practice to be studied empirically rather than a hidden mental act or a settled economic fact. Consolidated by Claes-Fredrik Helgesson and Fabian Muniesa and complemented by Michèle Lamont's comparative sociology of valuation and evaluation, it follows how rankings, metrics, prices, and evaluation procedures actually do their work, and asks how worth comes to be, by whom, with which devices, and to what effect.The infrastructure studies method, developed by Susan Leigh Star, Geoffrey Bowker, and Karen Ruhleder, studies the normally invisible relational systems—standards, classifications, pipes, protocols, and installed bases—on which modern life silently depends. Its signature move is 'infrastructural inversion': deliberately foregrounding the background, treating the taken-for-granted substrate as the object of analysis, and reading its standards, classifications, and breakdowns to understand how it shapes work, knowledge, and lives.
ScholarGateمجموعة البيانات
  1. v1
  2. 2 المصادر
  3. PUBLISHED
  1. v1
  2. 2 المصادر
  3. PUBLISHED

انتقل إلى البحث تنزيل الشرائح

ScholarGateقارن الطرق: Valuation Studies Method · Infrastructure Studies. استُرجع بتاريخ 2026-06-24 من https://scholargate.app/ar/compare