ScholarGate
المساعد

قارن الطرق

راجع الطرق التي اخترتها جنبًا إلى جنب؛ الصفوف المختلفة مميَّزة.

توجيه المخزون×كانبان×تخطيط متطلبات المواد×
المجالإدارة العملياتإدارة العملياتإدارة العمليات
العائلةMachine learningMachine learningMachine learning
سنة النشأة201419501975
صاحب الطريقةCoelho, L. C., Cordeau, J. F., & Laporte, G.Taiichi OhnoJoseph Orlicky
النوعOptimization problemProduction control systemMaterial planning algorithm
المصدر التأسيسيCoelho, L. C., Cordeau, J. F., & Laporte, G. (2014). Thirty years of inventory routing. Transportation Research Part B: Methodological, 55, 28-67. DOI ↗Ohno, T. (1988). Toyota production system: Beyond large-scale production. Cambridge, MA: Productivity Press. link ↗Orlicky, J. (1975). Material requirements planning: The new way of life in production and inventory management. New York: McGraw-Hill. link ↗
الأسماء البديلةIRP, vendor-managed logisticsvisual management, pull systemMRP, MRP I
ذات صلة555
الملخصThe Inventory Routing Problem (IRP) is an optimization problem that jointly determines inventory levels at customer locations, delivery routes, and shipment quantities to minimize total logistics and inventory holding costs. Rather than treating inventory management and vehicle routing as separate decisions, IRP recognizes that they are interdependent: larger shipments reduce routing costs but increase inventory holding costs, and vice versa. IRP is solved using mixed-integer programming, heuristics, and metaheuristics, and is a cornerstone of vendor-managed inventory (VMI) programs.Kanban is a pull-based production control system developed by Taiichi Ohno at Toyota in the 1950s that uses visual signals (traditionally cards or bins) to trigger production and movement of materials based on actual demand rather than forecasts. The Japanese word 'kanban' means 'visual card' or 'sign,' and the system operates on the principle that work should flow in response to downstream requirements. Kanban is a foundational element of the Toyota Production System and lean manufacturing, enabling just-in-time production, reduced inventory, and improved flow efficiency.Material Requirements Planning (MRP) is a computerized system developed by Joseph Orlicky in the 1970s that calculates material requirements based on master production schedules and bill-of-materials data. MRP determines what materials to buy, how much to order, and when to order them to meet production demand while minimizing inventory carrying costs. It became a foundational technology for manufacturing planning and later evolved into manufacturing resource planning (MRP II) and enterprise resource planning (ERP) systems.
ScholarGateمجموعة البيانات
  1. v1
  2. 2 المصادر
  3. PUBLISHED
  1. v1
  2. 2 المصادر
  3. PUBLISHED
  1. v1
  2. 2 المصادر
  3. PUBLISHED

انتقل إلى البحث تنزيل الشرائح

ScholarGateقارن الطرق: Inventory Routing · Kanban · Material Requirements Planning. استُرجع بتاريخ 2026-06-20 من https://scholargate.app/ar/compare