ScholarGate
المساعد

قارن الطرق

راجع الطرق التي اخترتها جنبًا إلى جنب؛ الصفوف المختلفة مميَّزة.

موازنة خط التجميع×الصيانة الإنتاجية الشاملة×
المجالإدارة العملياتإدارة العمليات
العائلةMachine learningMachine learning
سنة النشأة20101988
صاحب الطريقةScholl, A.Seiichi Nakajima
النوعOptimization problemMaintenance and productivity system
المصدر التأسيسيScholl, A. (2010). Balancing and sequencing of assembly lines. Physica-Verlag. link ↗Nakajima, S. (1988). Introduction to TPM: Total Productive Maintenance. Cambridge, MA: Productivity Press. link ↗
الأسماء البديلةline balancing, workload balancingTPM
ذات صلة55
الملخصAssembly Line Balancing is the problem of distributing a sequence of assembly tasks across a series of workstations on a production line such that work is evenly distributed, idle time is minimized, and throughput constraints are satisfied. The goal is to assign tasks to stations such that the total work time at each station is as equal as possible, optimizing for production rate (cycle time) and resource utilization. This is a classic optimization problem in manufacturing, solved through heuristic and exact algorithms, essential to the efficiency of mass production systems.Total Productive Maintenance (TPM) is a comprehensive maintenance management approach developed by Seiichi Nakajima in the late 1980s that emphasizes employee involvement, preventive maintenance, and continuous improvement to maximize equipment effectiveness. Unlike traditional reactive maintenance, TPM integrates maintenance activities across all organizational levels—from operators to executives—and focuses on eliminating losses (downtime, defects, speed losses) to achieve sustained production efficiency, quality, and safety.
ScholarGateمجموعة البيانات
  1. v1
  2. 2 المصادر
  3. PUBLISHED
  1. v1
  2. 2 المصادر
  3. PUBLISHED

انتقل إلى البحث تنزيل الشرائح

ScholarGateقارن الطرق: Assembly Line Balancing · Total Productive Maintenance. استُرجع بتاريخ 2026-06-18 من https://scholargate.app/ar/compare