Risk-based Six Sigma DMAIC
Risk-based Six Sigma DMAIC embeds structured risk assessment — typically failure mode and effects analysis (FMEA), risk priority numbers (RPN), or probabilistic risk tools — at each stage of the standard DMAIC cycle. The goal is not only to reduce defects and variation but to prioritize improvement actions by their risk consequence, ensuring that critical failure modes are addressed before less impactful ones. It is widely applied in manufacturing, healthcare, aerospace, and process industries where both quality and safety are at stake.
Rekod sumber
Petikan disalin secara verbatim daripada rekod sumber kaedah. Tiada pengesahan peringkat tuntutan disimpulkan daripadanya.
- De Mast, J., & Lokkerbol, J. (2012). An analysis of the Six Sigma DMAIC method from the perspective of problem solving. International Journal of Production Economics, 139(2), 604–614. · DOI 10.1016/j.ijpe.2012.05.035
- Six Sigma. Wikipedia. · URL
Tuntutan yang dikurasi
Tuntutan disimpan dalam lejar bukti, setiap satu dengan penilaiannya sendiri.
Pandangan ini tidak mencipta penilaian tuntutan apabila lejar tiada.
Kaedah berkaitan
Dijana daripada graf kaedah dan ditunjukkan sebagai perhubungan yang dicadangkan mesin — tiada tuntutan bukti disimpulkan.