Gompertz Substitution Forecasting
Gompertz substitution forecasting projects the adoption, diffusion, or substitution of a technology by fitting the asymmetric Gompertz growth curve to historical data and extrapolating it toward a saturation ceiling. Like the symmetric logistic used in the Fisher-Pry substitution model, the Gompertz curve captures the characteristic S-shape of technological change — slow initial uptake, rapid mid-life growth, and tapering as the market saturates — but unlike the logistic it is asymmetric, reaching its fastest growth early, at roughly 37 percent of the ceiling rather than at the midpoint. This makes it a natural choice when a new technology accelerates quickly and then approaches its limit gradually. Within the futures and foresight toolkit catalogued by Glenn and Gordon, growth-curve forecasting of this kind is a core quantitative method for anticipating when a technology will mature and when a successor is likely to displace it.
Record di origine
Citazioni copiate testualmente dal record di origine del metodo. Non si inferisce alcuna verifica a livello di affermazione da esse.
- Fisher, J. C., & Pry, R. H. (1971). A simple substitution model of technological change. Technological Forecasting and Social Change, 3, 75-88. · DOI 10.1016/S0040-1625(71)80005-7
- Glenn, J. C., & Gordon, T. J. (Eds.). (2009). Futures Research Methodology, Version 3.0. The Millennium Project. · ISBN 9780981894119
Affermazioni curate
Affermazioni persistite nel registro delle evidenze, ciascuna con la propria valutazione.
Questa vista non inventa una valutazione dell'affermazione quando il registro non ne ha.
Metodi correlati
Generato dal grafo dei metodi e mostrato come relazioni suggerite dalla macchina — nessuna affermazione di evidenza viene inferita.