Risk-based control chart
A risk-based control chart extends the classical Shewhart control chart by explicitly incorporating the costs and probabilities of two error types — false alarms (Type I) and missed shifts (Type II) — along with sampling costs, into the design of chart parameters. Rather than using arbitrary 3-sigma limits, the method selects sample size, sampling interval, and control limits to minimise the total expected cost or risk of operating the monitoring scheme.
Dossier source
Citations copiées telles quelles du dossier source de la méthode. Aucune vérification au niveau de la revendication n'en est déduite.
- Lorenzen, T. J., & Vance, L. C. (1986). The economic design of control charts: A unified approach. Technometrics, 28(1), 3–10. · DOI 10.1080/00401706.1986.10488092
- Duncan, A. J. (1956). The economic design of X̄ charts used to maintain current control of a process. Journal of the American Statistical Association, 51(274), 228–242. · DOI 10.1080/01621459.1956.10501322
Revendications organisées
Revendications enregistrées dans le registre de preuves, chacune avec sa propre évaluation.
Cette vue n'invente pas d'évaluation de revendication lorsque le registre n'en contient aucune.
Méthodes apparentées
Généré à partir du graphe de méthodes et présenté comme des relations suggérées par la machine — aucune revendication de preuve n'est déduite.