Scenario Axes Method
The scenario axes method is the deductive, double-uncertainty technique at the heart of much modern scenario planning: take the two driving forces that matter most and are least predictable, cross them as orthogonal axes, and develop the four resulting quadrants into distinct, internally consistent scenarios. Paul Schoemaker's 1995 account of scenario planning as a tool for strategic thinking established the logic of building scenarios from a small set of critical uncertainties, and Bishop, Hines and Collins's survey of scenario techniques names the 2x2 axes approach as the most widely used deductive method. Its appeal is structural clarity: by reducing a tangle of forces to two key uncertainties and a clean matrix, it produces a manageable, memorable set of four contrasting futures that span the most important dimensions of uncertainty. Treated here as a standalone scenario-construction device, the method is prized for turning the open-ended art of scenario building into a disciplined, repeatable procedure.
Quellendatensatz
Zitate wörtlich aus dem Quellendatensatz der Methode übernommen. Daraus wird keine Überprüfung auf Claim-Ebene abgeleitet.
- Schoemaker, P. J. H. (1995). Scenario planning: A tool for strategic thinking. Sloan Management Review, 36(2), 25-40. · URL
- Bishop, P., Hines, A., & Collins, T. (2007). The current state of scenario development: an overview of techniques. Foresight, 9(1), 5-25. · DOI 10.1108/14636680710727516
Kuratiert Claims
Claims im Evidenz-Ledger gespeichert, jeder mit seiner eigenen Bewertung.
Diese Ansicht erfindet keine Claim-Bewertung, wenn das Ledger keine hat.
Verwandte Methoden
Generiert aus dem Methoden-Graphen und als maschinell vorgeschlagene Beziehungen angezeigt – es wird kein Evidenz-Claim abgeleitet.