Risk-based control chart
A risk-based control chart extends the classical Shewhart control chart by explicitly incorporating the costs and probabilities of two error types — false alarms (Type I) and missed shifts (Type II) — along with sampling costs, into the design of chart parameters. Rather than using arbitrary 3-sigma limits, the method selects sample size, sampling interval, and control limits to minimise the total expected cost or risk of operating the monitoring scheme.
উৎস রেকর্ড
পদ্ধতির উৎস রেকর্ড থেকে উদ্ধৃতিগুলি হুবহু অনুলিপি করা হয়েছে। এগুলি থেকে কোনও দাবি-স্তরের যাচাইকরণ অনুমান করা হয় না।
- Lorenzen, T. J., & Vance, L. C. (1986). The economic design of control charts: A unified approach. Technometrics, 28(1), 3–10. · DOI 10.1080/00401706.1986.10488092
- Duncan, A. J. (1956). The economic design of X̄ charts used to maintain current control of a process. Journal of the American Statistical Association, 51(274), 228–242. · DOI 10.1080/01621459.1956.10501322
কিউরেটেড দাবি
প্রমাণ লেজারে দাবিগুলি সংরক্ষিত আছে, প্রতিটির নিজস্ব মূল্যায়ন সহ।
প্রমাণ লেজারে কিছু না থাকলে এই ভিউ কোনও দাবি মূল্যায়ন তৈরি করে না।
সম্পর্কিত পদ্ধতি
পদ্ধতি গ্রাফ থেকে তৈরি এবং মেশিন-প্রস্তাবিত সম্পর্ক হিসাবে দেখানো হয়েছে — কোনও প্রমাণ দাবি অনুমান করা হয় না।